The roads in the project are divided into two types:
1) The main road has a total boundary of 25m in width.
- This includes the traffic surface is 14m wide.
- Total of 4 traffic lanes, 2 lanes on each side with 3.5m wide per lane.
- The shoulder lane is 2m wide on each side.
- The pavement is reinforced concrete with thickness of 0.21m which is adjacent to the rainwater drainage channel, a width of 1.5m.
- Each of the pavement is 2m wide with high and low voltage poles and fire extinguisher are install along the the sidewalks.
- The sewage and water pipes are installed underneath the pavement areas.
2) The secondary road has a total boundary of 20m in width.
- This includes the traffic surface is 8.5m wide.
- Total of 2 traffic lanes and each lanes is 4.25m wide.
- The shoulder lane is 2m wide on each side.
- The pavement is reinforced concrete with thickness of 0.21m which is adjacent to the rainwater drainage channel, a width of 1.5m.
- Each of the pavement is 2.25m wide with high and low voltage poles and fire extinguisher are install along the the sidewalks.
- The sewage and water pipes are installed underneath the pavement areas.